The record

The Record
5 Days to 5 Years

Every project below is one where our cameras stood on the site and ran from the first day to the last. The figure is how long the camera was there — not the length of the contract.

We publish it because it can be checked. The project names are real, the films that are public open in one click, and every figure comes from our own installation records.

  • Longest

    ONE Bangkok — 5 years 7 months, one camera, one position, not a day missing.

  • Shortest

    Event builds measured in days, struck the moment the event ends.

  • Past two years

    Several of the projects below — past the point rented off-the-shelf kit reaches.

The record

Every project, longest first

Project Type Recorded for Film
ONE Bangkok Project 5 years 7 months
Dusit Thani · Dusit Central Park Demolition + build 5 years 6 months
Bangkok Church Building 3 years 8 months
THE EMSPHERE Project 3 years
QSNCC Project 2 years 11 months
UOB Head Office Building 2 years 11 months
DIB Demolition 2 years 6 months
ICONSIAM Project 2 years
Siam Premium Outlets Project 2 years
Stonehill Project 2 years
JLK Building 1 year 7 months
Combined-cycle power plant, Rayong Demolition 555 days
Endeavor Indoor 1 year 5 months
Project ONE Project 1 year 4 months
Emerald (FPIT warehouse) Warehouse 1 year
PVC plant for Europe (BOP 2X) Project 10 months
FN Indoor 8 months
Mercedes-Benz Building 7 months
Unicon II Project 6 months
Nestlé feed mill, Rayong Factory 5 months
Panus bus body assembly Indoor 4 months
WHA Indoor 2 months
Converse Indoor 1 month
Table Demolition 1 week
Bridge Project 1 week
TWC Project 7 days
The Mall Thapra Event 5 days
FWD Event 4 days

A blank in the film column means the owner has not released that project publicly. The footage exists and was delivered; we simply do not publish it ourselves.

See every film in the gallery →

Reading the table

What these figures actually say

Long jobs are a different problem

Recording a few days and recording five years are not the same task done for longer. A camera left in place for five years has to survive sun, rain, dust, power cuts and dropped connections, and somebody has to check every day that frames are still arriving. Several of the projects here ran past two years, which is where rented off-the-shelf kit stops.

The figure is time on site

These are not contract lengths or project lengths. They run from the day the camera was commissioned to the last frame recorded, which is why some are shorter than the project itself — on a few jobs we arrived late or came off before the site closed.

Short jobs still need a system

A job of a few days like FWD offers no second chance: get the setup wrong on day one and that is the job. A five-year job at least leaves room to correct. Short work needs a more careful survey than people expect, not a lighter one.

Why we publish this

Anyone can write "over twenty years' experience." Naming the projects and the days is only possible if the work is there. We would rather clients compared us on the record than on the adjectives.

Next step

Arrange a site survey

Tell us where the project is, when it starts and roughly how long it runs. We will arrange to see the site, then propose the number of cameras and the mounting points that suit it.

Phone

Thanet Duangphattra
081-828-7131

You can reach us on LINE, or call 081-828-7131.