The same camera in the same configuration does not serve a factory the way it serves a tower. The rhythm and the constraints are different. These four are what we plan around before anything is installed.
Fast shell, slow fit-out
A steel frame goes up fast — some sites are framed and roofed within weeks. Then machinery and services take months during which the outside barely changes. Left at one fixed interval, the film races through the first phase and stalls through the second. We change the interval as the work changes.
Wide, not tall
A tower can be covered from one position. A factory spreads sideways for hundreds of metres, which makes the mounting point the decision that matters most. Some sites need an unusually wide lens; some need more than one camera to hold the whole footprint. That is settled on the survey, not on installation day.
Dust, welding and sun
Industrial sites carry far more dust than a city building site, and welding throws violent flashes at irregular intervals. A camera left to meter for itself gets confused and the sequence flickers. Our rigs are built to sit outdoors for the length of a project, and exposure stays under our control rather than the camera's.
The work inside counts too
In many plants the most valuable work happens after the roof is on — laying out the production line and setting the machinery. That is indoor work, with inconsistent light and little room. We mount cameras inside as well, set up for factory lighting rather than daylight.